In April 2019, BSRIA launched TG 19/2019 Soft Landings and Business-Focused Maintenance Topic Guide. The free to download guide is an ‘at a glance publication’ giving readers a glimpse of the subject and pointing them towards further reading.
The design and construction of a building should allow it to perform at its optimum. Once it is in operation it is crucial to maintain the building to ensure its effectiveness and efficiency in supporting its function as well as the occupants’ needs and wellbeing.
In most buildings, maintenance is carried out to preserve physical assets through failure prevention schedules. Creating such schedules without knowing which assets are critical for business continuity can result in overspending or disruption due to emergency repairs.
Maintenance schedules should be customised to focus more on the requirements specific to the needs of the business. Business-focused maintenance (BFM) is a planned maintenance structure that supports business function by identifying critical assets and then shaping maintenance activities to suit.
BSRIA’s topic guide helps those involved in the design, construction and operation of a building to understand how an effective BFM regime can be developed and achieved through the soft landings approach.
Nick Blake, the guide’s co-author and Principal Consultant – Facilities Management at BSRIA, said:
“Maintenance can have a major impact on the success of a business and, therefore, can deliver a competitive advantage. It shouldn’t be considered as an overhead – but as a way of adding value to the business. Each building, therefore, should have its own bespoke maintenance programme which can enable the FM to prevent asset failures through a more pragmatic approach.
“BFM can help the team to first decide which assets are crucial in achieving the business goals and the end users’ needs. Then, Soft Landings success criteria in terms of the availability, accessibility and manageability of those assets can be set.
“Both BFM and Soft Landings are well-established industry practices. This topic guide has sketched out how the two can be applied to a project in synchrony.”
TG 19/2019 Soft Landings and Business-Focused Maintenance is free to download from the BSRIA website.
A six-step process for implementing this approach can be found in BSRIA Guide BG 53/2016 Business-Focused Maintenance.
--BSRIA
[edit] Related articles on Designing Buildings Wiki
- 2020 Soft Landings Conference.
- Better Buildings Partnership.
- BREEAM Aftercare support.
- BSRIA.
- BSRIA articles on Designing Buildings Wiki.
- BSRIA Soft Landings Awards.
- BSRIA Soft Landings 2019 award winners.
- Business focused maintenance.
- Extended aftercare.
- Initial aftercare.
- Maintenance.
- Maximising maintenance budgets after lockdown.
- Post occupancy evaluation.
- Post project review.
- Performance in use.
- Servitisation, smart systems and connectivity of instrumentation.
- Soft landings.
- Soft Landings for owners.
- Success criteria for soft landings projects.
Featured articles and news
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.